Karankawa 2 Expansion

Karankawa 2 Expansion is a 98.3 MW onshore wind request withdrawn in the ERCOT interconnection queue, in San Patricio County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2019 (completed)
  2. Withdrawn / abandonedSep 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
20INR0265
Grid region
ERCOT (Texas)
Developer
Karankawa Wind, LLC
Connection point (POI)
tap 345kV 8455 Lon Hill - 5725 Pawnee, new sub Goddard
Location
San Patricio County, Texas
Technology
Wind: 98.3 MW
Total requested
98.3 MW
Study phase
FIS Complete
Queue status
Withdrawn
Entered queue
12 May 2019
Proposed online date
December 2022
Withdrawn
September 2020

Location

Marker shows the centre of San Patricio County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in San Patricio County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem