RE Palmwood 1 Solar

RE Palmwood 1 Solar is a 98.0 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
16INR0063
Grid region
ERCOT (Texas)
Developer
Recurrent Energy
Technology
Solar: 98.0 MW
Total requested
98.0 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
15 September 2014
Proposed online date
December 2017

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem