United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTTimberwolf Solar Increase
Timberwolf Solar Increase is a 80.0 MW solar request withdrawn in the ERCOT interconnection queue, in Upton County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2019 (completed)
- Withdrawn / abandonedSep 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 21INR0422
- Grid region
- ERCOT (Texas)
- Developer
- CED Crane Solar 2, LLC
- Connection point (POI)
- 76635 King Mt 138kV
- Location
- Upton County, Texas
- Technology
- Solar: 80.0 MW
- Total requested
- 80.0 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 13 August 2019
- Proposed online date
- May 2021
- Withdrawn
- September 2019
Location
Marker shows the centre of Upton County; the queue data does not give exact sites.
Other requests in Upton County
- McCamey's Castle BatteryBattery storage Β· 410 MW Β· agreement signed
- Larkspur Energy StorageBattery storage Β· 308 MW Β· agreement signed
- Grandfalls SolarSolar + storage Β· 176 MW Β· agreement signed
- West Royal Natural Gas (TEF-Due Diligence)Gas Β· 888 MW Β· in study
- Shadow Ranch SolarSolar Β· 808 MW Β· in study
- Tres Rios Ranch SolarSolar + storage Β· 508 MW Β· in study
- WindeckerOnshore wind Β· 420 MW Β· in study
- BRP Aras BESSBattery storage Β· 304 MW Β· in study
- Badger SolarSolar + storage Β· 302 MW Β· in study
- Vista Bluff Wind II "Alternate POI"Onshore wind Β· 290 MW Β· in study
- Vista Bluff Wind I "Alternate POI"Onshore wind Β· 290 MW Β· in study
- Tres Rios Ranch BESSSolar + storage Β· 290 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem