Lunis Creek Storage 1

Lunis Creek Storage 1 is a 81.2 MW battery storage request withdrawn in the ERCOT interconnection queue, in Jackson County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2019 (completed)
  2. Withdrawn / abandonedJan 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
21INR0345
Grid region
ERCOT (Texas)
Developer
Lunis Creek Solar Project, LLC
Connection point (POI)
tap 345kV 8956 White Point - 5915 STP
Location
Jackson County, Texas
Technology
Battery: 81.2 MW
Total requested
81.2 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
1 May 2019
Proposed online date
December 2023
Withdrawn
January 2022

Location

Marker shows the centre of Jackson County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Jackson County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem