SOLAR Β· ERCOT

Parker Ranch Solar 1

Parker Ranch Solar 1 is a 88.0 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
16INR0058
Grid region
ERCOT (Texas)
Developer
SunPower
Connection point (POI)
Alamito-Barilla 138kV
Technology
Solar: 88.0 MW
Total requested
88.0 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
27 August 2014
Proposed online date
December 2018

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem