SOLAR Β· ERCOTFirst Solar - Uvalde Solar
First Solar - Uvalde Solar is a 90.0 MW solar request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2010 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 12INR0063
- Grid region
- ERCOT (Texas)
- Developer
- First Solar
- Technology
- Solar: 90.0 MW
- Total requested
- 90.0 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 9 December 2010
- Proposed online date
- December 2050