SOLAR Β· ERCOT

Percy Farm Solar 2

Percy Farm Solar 2 is a 96.6 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
24INR0170
Grid region
ERCOT (Texas)
Developer
AELIUS SOLAR CORP
Connection point (POI)
Tap 345kV 8123 Blessing - 5915 STP
Technology
Solar: 96.6 MW
Total requested
96.6 MW
Study phase
FIS & SS Incomplete
Queue status
Withdrawn
Entered queue
6 January 2022
Proposed online date
March 2024

Location

No county location in the queue data.

Power plants in Β· Transmission lines in