SOLAR Β· ERCOTPercy Farm Solar 2
Percy Farm Solar 2 is a 96.6 MW solar request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2022 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 24INR0170
- Grid region
- ERCOT (Texas)
- Developer
- AELIUS SOLAR CORP
- Connection point (POI)
- Tap 345kV 8123 Blessing - 5915 STP
- Technology
- Solar: 96.6 MW
- Total requested
- 96.6 MW
- Study phase
- FIS & SS Incomplete
- Queue status
- Withdrawn
- Entered queue
- 6 January 2022
- Proposed online date
- March 2024