United States › Grid › Interconnection queues › Texas
OTHER · ERCOTLlano Estacado Energy Storage
Llano Estacado Energy Storage is a 98.0 MW other request withdrawn in the ERCOT interconnection queue, in Howard County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2022 (completed)
- Withdrawn / abandonedSep 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 24INR0231
- Grid region
- ERCOT (Texas)
- Developer
- VESI 40 LLC
- Connection point (POI)
- 1324 Big Spring West 138 kV
- Location
- Howard County, Texas
- Technology
- Other: 98.0 MW
- Total requested
- 98.0 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 17 April 2022
- Proposed online date
- July 2025
- Withdrawn
- September 2023
Location
Marker shows the centre of Howard County; the queue data does not give exact sites.
Other requests in Howard County
- Ariji BESSBattery storage · 100 MW · agreement signed
- Infinium SolarSolar · 402 MW · in study
- Crater BESSBattery storage · 302 MW · in study
- Bhalu StorageBattery storage · 206 MW · in study
- Les Energy StorageBattery storage · 205 MW · in study
- Carolina Storage MidlandBattery storage · 205 MW · in study
- Prospector Energy StorageBattery storage · 205 MW · in study
- Carolina Storage OdessaBattery storage · 203 MW · in study
- Rattlesnake Gap Wind SLFOnshore wind · 200 MW · in study
- Prairie Blossom StorageBattery storage · 123 MW · in study
- Luthor SolarSolar · 101 MW · in study
- Calf Creek StorageBattery storage · 101 MW · in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem