Jaguarundi Solar

Jaguarundi Solar is a 90.3 MW solar request withdrawn in the ERCOT interconnection queue, in Archer County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2023 (completed)
  2. Withdrawn / abandonedApr 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25INR0335
Grid region
ERCOT (Texas)
Developer
Jaguarundi Solar, LLC
Connection point (POI)
NAVY KICKAPOO SWITCH (NAVYKSS1_8 #1472)
Location
Archer County, Texas
Technology
Solar: 90.3 MW
Total requested
90.3 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
26 March 2023
Proposed online date
July 2027
Withdrawn
April 2025

Location

Marker shows the centre of Archer County; the queue data does not give exact sites.