United States › Grid › Interconnection queues › Texas
ONSHORE WIND · ERCOTShannon Wind Repower
Shannon Wind Repower is a 18.5 MW onshore wind request in interconnection study in the ERCOT interconnection queue, in Archer County, Texas.
Queue statusIn planning
- PlanningQueued Feb 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Sep 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 25INR0583
- Grid region
- ERCOT (Texas)
- Developer
- Shannon Wind, LLC
- Connection point (POI)
- 1458 Cobb Switching Station 345 kV
- Location
- Archer County, Texas
- Technology
- Wind: 18.5 MW
- Total requested
- 18.5 MW
- Study phase
- SS Completed, FIS Started, No IA
- Queue status
- Active
- Entered queue
- 27 February 2024
- Proposed online date
- September 2027
Location
Marker shows the centre of Archer County; the queue data does not give exact sites.
Other requests in Archer County
- Red Hollow Renewable Energy Solar SLFSolar + storage · 309 MW · in study
- Ringtail Energy StorageBattery storage · 204 MW · in study
- Carolina Storage Wichita FallsBattery storage · 202 MW · in study
- Berryman Road StorageBattery storage · 155 MW · in study
- Trinity Hills BESS SLFBattery storage · 94.0 MW · in study
- Bobcat Bluff repowerOnshore wind · 12.0 MW · built
- Hat Creek SolarSolar · 252 MW · withdrawn
- Jaguarundi StorageOther · 91.1 MW · withdrawn
- Jaguarundi SolarSolar · 90.3 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem