United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in ISO-NE (New England) — page 10
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Offshore Wind Increase Offshore wind |
40.0 MW | Withdrawn / abandoned |
| Biomass Other |
40.0 MW | Withdrawn / abandoned |
| Combined Cycle Upgrade Gas |
40.0 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
40.0 MW | Withdrawn / abandoned |
| Solar Solar |
40.0 MW | Withdrawn / abandoned |
| Wind farm Onshore wind |
39.6 MW | Withdrawn / abandoned |
| Gas Turbine Gas |
39.0 MW | Withdrawn / abandoned |
| (Offshore wind Increase (Q700 +Q1154) Offshore wind |
38.8 MW | Withdrawn / abandoned |
| Towantic Energy increase Gas |
38.0 MW | Withdrawn / abandoned |
| Biomass Other |
37.0 MW | Withdrawn / abandoned |
| Palmer Renewable Energy Other |
36.7 MW | Withdrawn / abandoned |
| Wind Repower Onshore wind |
35.2 MW | Withdrawn / abandoned |
| E. Winchendon Substation - NG WMA Group 3 Solar + storage |
35.0 MW | Withdrawn / abandoned |
| Gas Turbine Gas |
35.0 MW | Withdrawn / abandoned |
| Solar Solar |
35.0 MW | Withdrawn / abandoned |
| Gas Turbine Capacity Increase ( See queue position Gas |
35.0 MW | Withdrawn / abandoned |
| Solar Solar |
35.0 MW | Withdrawn / abandoned |
| Wind Project Onshore wind |
34.9 MW | Withdrawn / abandoned |
| Repowering Increase Gas |
34.8 MW | Withdrawn / abandoned |
| Wood River - NG WRI DG Area Study #2 >5 MW Solar |
34.4 MW | Withdrawn / abandoned |
| Wind Project Onshore wind |
34.0 MW | Withdrawn / abandoned |
| Wind Onshore wind |
34.0 MW | Withdrawn / abandoned |
| Eversource Group @ Tremont Substation 713 Solar + storage |
33.7 MW | Withdrawn / abandoned |
| Solar Solar |
33.1 MW | Withdrawn / abandoned |
| Combined Cycle Increase Gas |
33.0 MW | Withdrawn / abandoned |
| Wind Onshore wind |
33.0 MW | Withdrawn / abandoned |
| Fair Haven Biomass Other |
33.0 MW | Withdrawn / abandoned |
| Kibby Wind Expansion Onshore wind |
33.0 MW | Withdrawn / abandoned |
| Wind Onshore wind |
33.0 MW | Withdrawn / abandoned |
| Biomass Other |
33.0 MW | Withdrawn / abandoned |
| Solar Solar |
31.4 MW | Withdrawn / abandoned |
| Biomass Other |
30.0 MW | Withdrawn / abandoned |
| Fuel Cell Gas |
30.0 MW | Withdrawn / abandoned |
| Solar Solar |
30.0 MW | Withdrawn / abandoned |
| Solar Solar |
30.0 MW | Withdrawn / abandoned |
| Combined Cycle Uprate Gas |
30.0 MW | Withdrawn / abandoned |
| Biomass Other |
30.0 MW | Withdrawn / abandoned |
| Deerfield Wind Onshore wind |
30.0 MW | Withdrawn / abandoned |
| Combined Cycle Upgrate #3 Gas |
30.0 MW | Withdrawn / abandoned |
| Solar Solar |
30.0 MW | Withdrawn / abandoned |
| Wind Onshore wind |
30.0 MW | Withdrawn / abandoned |
| GMP Generator Replacement Gas |
29.5 MW | Withdrawn / abandoned |
| Eversource Group @ Industrial Park 636 Solar + storage |
29.1 MW | Withdrawn / abandoned |
| Gas Turbine (Additional Capacity) Other |
29.0 MW | Withdrawn / abandoned |
| Power Station Increase Nuclear |
29.0 MW | Withdrawn / abandoned |
| Fuel Cell Gas |
28.9 MW | Withdrawn / abandoned |
| EE Group @ Blandford Solar + storage |
28.9 MW | Withdrawn / abandoned |
| Wind Onshore wind |
28.8 MW | Withdrawn / abandoned |
| CMP Lakewood 115 kV SS - Winslow-Lakewood Areas Study Solar |
28.7 MW | Withdrawn / abandoned |
| Hydro Hydro |
28.3 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)