United States βΊ Grid βΊ Interconnection queues βΊ Maine
HYDRO Β· ISO-NEHydro
Hydro is a 28.3 MW hydro request withdrawn in the ISO-NE interconnection queue, in Oxford County, Maine.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2016 (completed)
- Withdrawn / abandonedApr 2018 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 597
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- CMP Section 230 (115 kV) at southeast end, high side of Verso Androscoggin substation
- Location
- Oxford County, Maine
- Technology
- Hydro: 28.3 MW
- Total requested
- 28.3 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 24 February 2016
- Proposed online date
- June 2019
- Withdrawn
- April 2018
Location
Marker shows the centre of Oxford County; the queue data does not give exact sites.
Other requests in Oxford County
- Twin Energy WindOnshore wind Β· 18.3 MW Β· agreement signed
- Roxbury SolarSolar Β· 2.0 MW Β· agreement signed
- Record Hill WindOnshore wind Β· 50.6 MW Β· built
- Canton Mountain WindsOnshore wind Β· 19.3 MW Β· built
- Spruce Mountain WindOnshore wind Β· 18.0 MW Β· built
- RoxWindOnshore wind Β· 15.3 MW Β· built
- Rumford Uprate and Battery additionOther Β· 8.5 MW Β· built
- SolarSolar Β· 4.6 MW Β· built
- SolarSolar Β· 4.6 MW Β· built
- Spruce Mountain Wind IncreaseOnshore wind Β· 2.0 MW Β· built
- 13665 Felt Road SolarSolar + storage Β· 2.0 MW Β· built
- Rumford Falls Unit #3 increaseHydro Β· 1.3 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem