Wind is a 33.0 MW onshore wind request withdrawn in the ISO-NE interconnection queue, in Franklin County, Maine.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2013 (completed)
  2. Withdrawn / abandonedJul 2014 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
419
Grid region
ISO-NE (New England)
Connection point (POI)
CMP 115 kV Bigalow Substation
Location
Franklin County, Maine
Technology
Wind: 33.0 MW
Total requested
33.0 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
2 May 2013
Proposed online date
November 2016
Withdrawn
July 2014

Location

Marker shows the centre of Franklin County; the queue data does not give exact sites.

Power plants in Maine Β· Transmission lines in Maine

Other requests in Franklin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem