United States βΊ Grid βΊ Interconnection queues βΊ Connecticut
GAS Β· ISO-NEFuel Cell
Fuel Cell is a 28.9 MW gas request withdrawn in the ISO-NE interconnection queue, in Fairfield County, Connecticut.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2006 (completed)
- Withdrawn / abandonedJan 2009 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 187
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- UI Congress substation
- Location
- Fairfield County, Connecticut
- Technology
- Gas: 28.9 MW
- Total requested
- 28.9 MW
- Service type
- Other
- Queue status
- Withdrawn
- Entered queue
- 5 December 2006
- Proposed online date
- June 2009
- Withdrawn
- January 2009
Location
No county location in the queue data.
Power plants in Connecticut Β· Transmission lines in Connecticut
Other requests in Fairfield County
- Bridgeport Energy PSS TuningGas Β· 588 MW Β· built
- PSEG Bridgeport Harbor CCGT ExpansionGas Β· 510 MW Β· built
- Bridgeport Energy UprateGas Β· 84.0 MW Β· built
- Waterside Power, LLCOther Β· 74.1 MW Β· built
- Cos Cob RedevelopmentOther Β· 45.8 MW Β· built
- SNEW Summer '03 Temporary GeneratorGas Β· 19.4 MW Β· built
- Third Taxing District Units 1, 2 & 3Other Β· 6.0 MW Β· built
- Bridgeport Fuel Cell 2Gas Β· 5.6 MW Β· built
- Fairfield UniversityGas Β· 5.0 MW Β· built
- Combined Cycle UpgradeGas Β· 4.0 MW Β· built
- Bridgeport Harbor Unit #5 UprateGas Β· 0.4 MW Β· built
- Combined CycleGas Β· 745 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem