United States › Grid › Interconnection queues › Massachusetts

OTHER · ISO-NE

Gas Turbine (Additional Capacity)

Gas Turbine (Additional Capacity) is a 29.0 MW other request withdrawn in the ISO-NE interconnection queue, in Suffolk County, Massachusetts.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2006 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
154
Grid region
ISO-NE (New England)
Connection point (POI)
NSTAR Chelsea Substation
Location
Suffolk County, Massachusetts
Technology
Oil: 29.0 MW
Total requested
29.0 MW
Service type
Other
Queue status
Withdrawn
Entered queue
31 May 2006
Proposed online date
August 2008

Location

Marker shows the centre of Suffolk County; the queue data does not give exact sites.

Power plants in Massachusetts · Transmission lines in Massachusetts

Other requests in Suffolk County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem