MATEP - Third CTG is a 12.5 MW gas request withdrawn in the ISO-NE interconnection queue, in Suffolk County, Massachusetts, connecting to NSTAR.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2008 (completed)
- Withdrawn / abandonedJan 2013 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 265
- Grid region
- ISO-NE (New England)
- Utility / transmission owner
- NSTAR
- Connection point (POI)
- NSTAR Brighton Substation
- Location
- Suffolk County, Massachusetts
- Technology
- Gas: 12.5 MW Β· Oil
- Total requested
- 12.5 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 16 June 2008
- Proposed online date
- June 2014
- Withdrawn
- January 2013
Location
Marker shows the centre of Suffolk County; the queue data does not give exact sites.
Power plants in Massachusetts Β· Transmission lines in Massachusetts
Other requests in Suffolk County
- Lite Brite Battery StorageBattery storage Β· 306 MW Β· agreement signed
- Hecate Energy Eastern Ave Energy CenterBattery storage Β· 250 MW Β· agreement signed
- MATEP (Medical Area Total Energy Project)Gas Β· 42.0 MW Β· built
- MATEP -3rd CTGGas Β· 14.1 MW Β· built
- MATEP (Combined Cycle) IncreaseGas Β· 1.7 MW Β· built
- Combined CycleGas Β· 800 MW Β· withdrawn
- Combined CycleGas Β· 800 MW Β· withdrawn
- Battery StorageBattery storage Β· 700 MW Β· withdrawn
- Battery StorageBattery storage Β· 276 MW Β· withdrawn
- Gas TurbineOther Β· 168 MW Β· withdrawn
- Gas Turbine (Additional Capacity)Other Β· 29.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem