United States β€Ί Grid β€Ί Interconnection queues β€Ί Massachusetts

GAS Β· ISO-NE

MATEP - Third CTG

MATEP - Third CTG is a 12.5 MW gas request withdrawn in the ISO-NE interconnection queue, in Suffolk County, Massachusetts, connecting to NSTAR.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2008 (completed)
  2. Withdrawn / abandonedJan 2013 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
265
Grid region
ISO-NE (New England)
Utility / transmission owner
NSTAR
Connection point (POI)
NSTAR Brighton Substation
Location
Suffolk County, Massachusetts
Technology
Gas: 12.5 MW Β· Oil
Total requested
12.5 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
16 June 2008
Proposed online date
June 2014
Withdrawn
January 2013

Location

Marker shows the centre of Suffolk County; the queue data does not give exact sites.

Power plants in Massachusetts Β· Transmission lines in Massachusetts

Other requests in Suffolk County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem