United States › Grid › Interconnection queues › Massachusetts
GAS · ISO-NEMATEP -3rd CTG
MATEP -3rd CTG is a 14.1 MW gas request built and operating in the ISO-NE interconnection queue, in Suffolk County, Massachusetts.
Request details
- Queue ID
- 404
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- NSTAR Brighton substation
- Location
- Suffolk County, Massachusetts
- Technology
- Gas: 14.1 MW · Oil
- Total requested
- 14.1 MW
- Service type
- Network resource (NRIS)
- Study phase
- Executed
- Queue status
- Operational
- Entered queue
- 8 January 2013
- Agreement signed
- 21 April 2014
- Proposed online date
- June 2017
Location
Marker shows the centre of Suffolk County; the queue data does not give exact sites.
Power plants in Massachusetts · Transmission lines in Massachusetts
Other requests in Suffolk County
- Lite Brite Battery StorageBattery storage · 306 MW · agreement signed
- Hecate Energy Eastern Ave Energy CenterBattery storage · 250 MW · agreement signed
- MATEP (Medical Area Total Energy Project)Gas · 42.0 MW · built
- MATEP (Combined Cycle) IncreaseGas · 1.7 MW · built
- Combined CycleGas · 800 MW · withdrawn
- Combined CycleGas · 800 MW · withdrawn
- Battery StorageBattery storage · 700 MW · withdrawn
- Battery StorageBattery storage · 276 MW · withdrawn
- Gas TurbineOther · 168 MW · withdrawn
- Gas Turbine (Additional Capacity)Other · 29.0 MW · withdrawn
- MATEP - Third CTGGas · 12.5 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem