United States βΊ Grid βΊ Interconnection queues βΊ Massachusetts
GAS Β· ISO-NECombined Cycle
Combined Cycle is a 800 MW gas request withdrawn in the ISO-NE interconnection queue, in Suffolk County, Massachusetts.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2020 (completed)
- Withdrawn / abandonedAug 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1012
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Eversource Mystic 115 kV station
- Location
- Suffolk County, Massachusetts
- Technology
- Gas: 800 MW
- Total requested
- 800 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 20 April 2020
- Proposed online date
- June 2024
- Withdrawn
- August 2020
Location
Marker shows the centre of Suffolk County; the queue data does not give exact sites.
Power plants in Massachusetts Β· Transmission lines in Massachusetts
Other requests in Suffolk County
- Lite Brite Battery StorageBattery storage Β· 306 MW Β· agreement signed
- Hecate Energy Eastern Ave Energy CenterBattery storage Β· 250 MW Β· agreement signed
- MATEP (Medical Area Total Energy Project)Gas Β· 42.0 MW Β· built
- MATEP -3rd CTGGas Β· 14.1 MW Β· built
- MATEP (Combined Cycle) IncreaseGas Β· 1.7 MW Β· built
- Combined CycleGas Β· 800 MW Β· withdrawn
- Battery StorageBattery storage Β· 700 MW Β· withdrawn
- Battery StorageBattery storage Β· 276 MW Β· withdrawn
- Gas TurbineOther Β· 168 MW Β· withdrawn
- Gas Turbine (Additional Capacity)Other Β· 29.0 MW Β· withdrawn
- MATEP - Third CTGGas Β· 12.5 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem