United States βΊ Grid βΊ Interconnection queues βΊ Maine
SOLAR Β· ISO-NESolar
Solar is a 31.4 MW solar request withdrawn in the ISO-NE interconnection queue, in Knox County, Maine.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2021 (completed)
- Withdrawn / abandonedDec 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1099
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Central Maine Power 34.5 kV Line Section 51A (S51A Tap βΓΓ¬ Highland) @ 44Β¬β07'59.3"N, 69Β¬β11'43.5"W
- Location
- Knox County, Maine
- Technology
- Solar: 31.4 MW
- Total requested
- 31.4 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 19 February 2021
- Proposed online date
- December 2024
- Withdrawn
- December 2022
Location
Marker shows the centre of Knox County; the queue data does not give exact sites.
Other requests in Knox County
- Battery Storage Addition (to QP1086)Solar + storage Β· 160 MW Β· agreement signed
- Warren Meadow SolarSolar Β· 74.5 MW Β· agreement signed
- Solar KnoxSolar Β· 33.5 MW Β· agreement signed
- SolarSolar Β· 20.0 MW Β· withdrawn
- Solar and BatterySolar + storage Β· 5.0 MW Β· withdrawn
- Highland/Park St 115 kV SS - Midcoast Area DG StudySolar Β· 2.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem