United States βΊ Grid βΊ Interconnection queues βΊ Maine
SOLAR Β· ISO-NESolar
Solar is a 20.0 MW solar request withdrawn in the ISO-NE interconnection queue, in Knox County, Maine.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2024 (completed)
- Withdrawn / abandonedAug 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1577
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- CMP 115KV SECTION 80
- Location
- Knox County, Maine
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 26 June 2024
- Proposed online date
- June 2028
- Withdrawn
- August 2024
Location
Marker shows the centre of Knox County; the queue data does not give exact sites.
Other requests in Knox County
- Battery Storage Addition (to QP1086)Solar + storage Β· 160 MW Β· agreement signed
- Warren Meadow SolarSolar Β· 74.5 MW Β· agreement signed
- Solar KnoxSolar Β· 33.5 MW Β· agreement signed
- SolarSolar Β· 31.4 MW Β· withdrawn
- Solar and BatterySolar + storage Β· 5.0 MW Β· withdrawn
- Highland/Park St 115 kV SS - Midcoast Area DG StudySolar Β· 2.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem