NUCLEAR · ISO-NE

Power Station Increase

Power Station Increase is a 29.0 MW nuclear request withdrawn in the ISO-NE interconnection queue, in New London County, Connecticut.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2009 (completed)
  2. Withdrawn / abandonedJun 2011 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
319
Grid region
ISO-NE (New England)
Connection point (POI)
CL&P Millstone 345 kV substation
Location
New London County, Connecticut
Technology
Nuclear: 29.0 MW
Total requested
29.0 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
14 December 2009
Proposed online date
November 2011
Withdrawn
June 2011

Location

No county location in the queue data.

Power plants in Connecticut · Transmission lines in Connecticut

Other requests in New London County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem