🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Massachusetts

GAS · ISO-NE

Repowering Increase

Repowering Increase is a 34.8 MW gas request withdrawn in the ISO-NE interconnection queue, in Norfolk County, Massachusetts.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2017 (completed)
  2. Withdrawn / abandonedMay 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
642
Grid region
ISO-NE (New England)
Connection point (POI)
BELD station 16 switchyard
Location
Norfolk County, Massachusetts
Technology
Gas: 34.8 MW · Oil
Total requested
34.8 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
26 April 2017
Proposed online date
May 2021
Withdrawn
May 2017

Location

Marker shows the centre of Norfolk County; the queue data does not give exact sites.

Power plants in Massachusetts · Transmission lines in Massachusetts

Other requests in Norfolk County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem