United States › Grid › Interconnection queues › Massachusetts
SOLAR + STORAGE · ISO-NEKearsarge Solar with battery
Kearsarge Solar with battery is a 5.4 MW solar + storage request built and operating in the ISO-NE interconnection queue, in Norfolk County, Massachusetts, connecting to NGRID.
Request details
- Queue ID
- 778
- Grid region
- ISO-NE (New England)
- Utility / transmission owner
- NGRID
- Connection point (POI)
- GRID circuit 335W1, Pole 11 on Williams Way, Bellingham
- Location
- Norfolk County, Massachusetts
- Technology
- Solar: 5.4 MW · Battery
- Total requested
- 5.4 MW
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 31 August 2018
- Proposed online date
- December 2021
Location
Marker shows the centre of Norfolk County; the queue data does not give exact sites.
Power plants in Massachusetts · Transmission lines in Massachusetts
Other requests in Norfolk County
- Medway Grid Battery StorageBattery storage · 250 MW · agreement signed
- Energy StorageBattery storage · 170 MW · agreement signed
- NEA Bell. Uprate (Northeast Energy Associates, LP)Gas · 1.4 MW · agreement signed
- Battery StorageBattery storage · 300 MW · in study
- Medway Peaker - SEMARIGas · 208 MW · built
- Thomas A. Watson Generating StationGas · 108 MW · built
- Battery Storage Increase (QP1238)Battery storage · 301 MW · withdrawn
- Battery StorageBattery storage · 270 MW · withdrawn
- Battery StorageBattery storage · 254 MW · withdrawn
- Battery StorageBattery storage · 250 MW · withdrawn
- Gas TurbineGas · 208 MW · withdrawn
- Battery StorageBattery storage · 200 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem