United States βΊ Grid βΊ Interconnection queues βΊ Rhode Island
SOLAR Β· ISO-NESolar
Solar is a 30.0 MW solar request withdrawn in the ISO-NE interconnection queue, in Washington County, Rhode Island.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2018 (completed)
- Withdrawn / abandonedOct 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 777
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- GRID L-190 line
- Location
- Washington County, Rhode Island
- Technology
- Solar: 30.0 MW
- Total requested
- 30.0 MW
- Queue status
- Withdrawn
- Entered queue
- 29 August 2018
- Proposed online date
- August 2020
- Withdrawn
- October 2019
Location
Marker shows the centre of Washington County; the queue data does not give exact sites.
Power plants in Rhode Island Β· Transmission lines in Rhode Island
Other requests in Washington County
- Battery StorageBattery storage Β· 205 MW Β· agreement signed
- Block Island Wind FarmOnshore wind Β· 29.0 MW Β· built
- Alton SolarSolar Β· 13.9 MW Β· built
- Chase Hill Substation - NG Western RI DG Area StudySolar Β· 6.8 MW Β· built
- WindOnshore wind Β· 536 MW Β· withdrawn
- WindOnshore wind Β· 385 MW Β· withdrawn
- Battery StorageBattery storage Β· 313 MW Β· withdrawn
- Battery StorageBattery storage Β· 180 MW Β· withdrawn
- Solar (QF)Solar Β· 56.5 MW Β· withdrawn
- Wood River Substation - Western RI DER Study #3Solar Β· 49.0 MW Β· withdrawn
- Solar (QF)Solar Β· 40.0 MW Β· withdrawn
- Wood River - NG WRI DG Area Study #2 >5 MWSolar Β· 34.4 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem