United States › Grid › Interconnection queues › Rhode Island

ONSHORE WIND · ISO-NE

Block Island Wind Farm

Block Island Wind Farm is a 29.0 MW onshore wind request built and operating in the ISO-NE interconnection queue, in Washington County, Rhode Island, connecting to NGRID.

Queue statusOperating
  1. PlanningQueued Jan 2013 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingTarget Dec 2016 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
405
Grid region
ISO-NE (New England)
Utility / transmission owner
NGRID
Connection point (POI)
Grid 34.5 kV
Location
Washington County, Rhode Island
Technology
Wind: 29.0 MW
Total requested
29.0 MW
Study phase
IA Executed
Queue status
Operational
Entered queue
18 January 2013
Proposed online date
December 2016

Location

Marker shows the centre of Washington County; the queue data does not give exact sites.

Power plants in Rhode Island · Transmission lines in Rhode Island

Other requests in Washington County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem