United States › Grid › Interconnection queues › Rhode Island
SOLAR · ISO-NEAlton Solar
Alton Solar is a 13.9 MW solar request built and operating in the ISO-NE interconnection queue, in Washington County, Rhode Island, connecting to NGRID.
Request details
- Queue ID
- 693
- Grid region
- ISO-NE (New England)
- Utility / transmission owner
- NGRID
- Connection point (POI)
- Grid 85T3 circuit
- Location
- Washington County, Rhode Island
- Technology
- Solar: 13.9 MW
- Total requested
- 13.9 MW
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 20 November 2017
- Proposed online date
- April 2020
Location
Marker shows the centre of Washington County; the queue data does not give exact sites.
Power plants in Rhode Island · Transmission lines in Rhode Island
Other requests in Washington County
- Battery StorageBattery storage · 205 MW · agreement signed
- Block Island Wind FarmOnshore wind · 29.0 MW · built
- Chase Hill Substation - NG Western RI DG Area StudySolar · 6.8 MW · built
- WindOnshore wind · 536 MW · withdrawn
- WindOnshore wind · 385 MW · withdrawn
- Battery StorageBattery storage · 313 MW · withdrawn
- Battery StorageBattery storage · 180 MW · withdrawn
- Solar (QF)Solar · 56.5 MW · withdrawn
- Wood River Substation - Western RI DER Study #3Solar · 49.0 MW · withdrawn
- Solar (QF)Solar · 40.0 MW · withdrawn
- Wood River - NG WRI DG Area Study #2 >5 MWSolar · 34.4 MW · withdrawn
- SolarSolar · 30.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem