NESO TEC REGISTER · GREAT BRITAIN

Grid connection projects in the connection queue on the SSEN Transmission (north Scotland) network

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown457.3 GW in total
In planning303scoping or awaiting consent
Consented or building52closest to connecting
Built89connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

45 projects
ProjectCapacityStageConnection siteFrom
Earba PSH
Hydro and pumped storage · Earba Limited
1.8 GWConsents Approved Earba PSH Powerhouse Substation
SSEN Transmission (north Scotland)
Oct 2035
Coire Glas Pumped Storage
Hydro and pumped storage · Coire Glas Hydro Pumped Storage Limited
612 MWConsents Approved Coire Glas GSP
SSEN Transmission (north Scotland)
Oct 2029
Earba PSH
Hydro and pumped storage · Earba Limited
600 MWConsents Approved Earba PSH Powerhouse Substation
SSEN Transmission (north Scotland)
Dec 2032
Loch na Cathrach Pumped Storage Hydro
Hydro and pumped storage · Statkraft Highlands Psh Limited
550 MWConsents Approved Knocknagael 275kV
SSEN Transmission (north Scotland)
Oct 2030
Loch na Cathrach Pumped Storage Hydro
Hydro and pumped storage · Statkraft Highlands Psh Limited
450 MWConsents Approved Knocknagael 275kV
SSEN Transmission (north Scotland)
Apr 2029
Blackhillock Battery
Battery storage · Blackhillock Flexpower Ltd
349 MWConsents Approved Blackhillock 400kV Substation
SSEN Transmission (north Scotland)
Oct 2028
Zenobe Blackhillock 300 MW
Battery storage · Zenobe Blackhillock Limited
300 MWConsents Approved Blackhillock 275kV Substation
SSEN Transmission (north Scotland)
Apr 2026
MeyGen Tidal
Battery storage · Meygrid Limited
237 MWConsents Approved Gills Bay GSP
SSEN Transmission (north Scotland)
Apr 2028
Strathy South Wind
Onshore wind · Sse Generation Limited
208 MWConsents Approved Strathy South 132/33kV Substation
SSEN Transmission (north Scotland)
Sep 2030
Muaitheabhal Wind Farm
Hydro and pumped storage · Uisenis Power Limited
189 MWConsents Approved Muaitheabhal 132/33kV Substation
SSEN Transmission (north Scotland)
Dec 2030
Stornoway Wind Farm
Onshore wind · Stornoway Wind Farm Limited
180 MWConsents Approved Arnish 275kV Substation
SSEN Transmission (north Scotland)
Oct 2030
Energy Isles
Onshore wind · Energy Isles Shetland Limited
120 MWConsents Approved Energy Isles 132kV Substation
SSEN Transmission (north Scotland)
Oct 2032
Slickly Wind Farm
Wind + storage · Slickly Wind Farm Limited
114 MWConsents Approved Slickly Wind Farm 132kV Substation
SSEN Transmission (north Scotland)
Dec 2029
Beaw Field Wind Farm
Onshore wind · Beaw Field Shetland Limited
102 MWConsents Approved Beaw Field 132/33kV Substation
SSEN Transmission (north Scotland)
Oct 2032
Pentland Floating Offshore Wind Farm
Offshore wind · Highland Wind Limited
100 MWConsents Approved Pentland Floating Offshore Wind Farm 132/66kV substation
SSEN Transmission (north Scotland)
Apr 2028
Chleansaid Wind Farm
Onshore wind · Esb Asset Development UK Limited
96 MWConsents Approved Chleansaid Wind Farm 132kV Substation
SSEN Transmission (north Scotland)
Sep 2028
Blarghour Wind
Onshore wind · Blarghour Wind Farm Limited
67 MWConsents Approved Blarghour Substation
SSEN Transmission (north Scotland)
Apr 2029
Cairn Duhie Wind Farm
Onshore wind · Cairn Duhie Energy Limited
67 MWConsents Approved Berryburn 275/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2028
Strathy Wood Wind Farm
Onshore wind · RWE Renewables UK Onshore Wind Limited
64 MWConsents Approved Strathy Wood 132/33kV Substation
SSEN Transmission (north Scotland)
Dec 2029
Tomchrasky Wind Farm
Onshore wind · E Power Limited
63 MWConsents Approved Tomchrasky Wind Farm 132/33kV Substation
SSEN Transmission (north Scotland)
Mar 2032
High Constellation Windfarm
Onshore wind · High Constellation Windfarm Limited
50 MWConsents Approved High Constellation 132/33kV Substation
SSEN Transmission (north Scotland)
Oct 2028
Lairg II Wind Farm
Onshore wind · Lairg II LLP
50 MWConsents Approved Lairg GSP
SSEN Transmission (north Scotland)
Jul 2027
Rothienorman 50MW BESS
Battery storage · Rothienorman Flexpower Ltd
50 MWConsents Approved Rothienorman 400/33kV Substation
SSEN Transmission (north Scotland)
Jul 2027
Aberarder Wind Farm
Onshore wind · Aberarder Wind Farm LLP
50 MWConsents Approved Aberarder Wind Farm 132/33kV Substation
SSEN Transmission (north Scotland)
Aug 2026
Corshellach Battery Energy Storage System
Battery storage · Corshellach Energy Storage Limited
50 MWConsents Approved Berryburn 275/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2028
Drum Farm Energy Storage Facility
Battery storage · Field Drum Farm Ltd
50 MWConsents Approved Keith 2 132/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2026
Glen Ullinish Wind Farm
Onshore wind · Glen Ullinish Wf Limited
50 MWConsents Approved Glen Ullinish 132/33kV Substation
SSEN Transmission (north Scotland)
Apr 2028
Lovat Estate BESS
Battery storage · LG-B-50a Limited
50 MWConsents Approved Beauly 132/33 kV GSP Substation
SSEN Transmission (north Scotland)
May 2026
Meetlaw BESS
Battery storage · Carravindoon Limited
50 MWConsents Approved Fiddes GSP
SSEN Transmission (north Scotland)
Oct 2031
Overhill BESS
Battery storage · Pulse Clean Energy Spv Watt Limited
50 MWConsents Approved Rothienorman 2 400/33kV GSP
SSEN Transmission (north Scotland)
Oct 2024
Dell Wind Farm
Onshore wind · Dell Wind Farm Limited
50 MWConsents Approved Dell 132kV Substation
SSEN Transmission (north Scotland)
Apr 2030
Hollandmey Renewable Energy Development
Onshore wind · Scottish Power Renewables (UK) Limited
50 MWConsents Approved Hollandmey Renewable Energy Development132/33kV Substation
SSEN Transmission (north Scotland)
May 2030
Garbet Wind Farm
Onshore wind · Garbet Wind Farm LLP
46 MWConsents Approved Keith 2 132/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2026
Perwinnes
Solar + storage · Perwinnes Solar And Battery Storage Limited
45 MWConsents Approved Dyce 132/33kV GSP
SSEN Transmission (north Scotland)
Oct 2028
Berryburn Extension Wind Farm
Onshore wind · Bb2 Wind Farm Limited
43 MWConsents Approved Berryburn 275/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2027
Coupar Angus Battery
Battery storage · Coupar Limited
40 MWConsents Approved Coupar Angus 132/33kV GSP
SSEN Transmission (north Scotland)
Feb 2022
Mossy Hill Wind Farm
Onshore wind · Mossy Hill Shetland Limited
40 MWConsents Approved Mossy Hill 132kV Substation
SSEN Transmission (north Scotland)
Jun 2029
Thainstone Energy Park
Other · Agile Energy Recovery (Inverurie) Limited
40 MWConsents Approved Kintore GSP
SSEN Transmission (north Scotland)
Oct 2029
Keith Battery Storage
Battery storage · Field Keith Ltd
39 MWConsents Approved Keith 1 132/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2026
Hill of Towie 2 Wind Farm
Onshore wind · Greenhills 1 Limited
36 MWConsents Approved Keith 2 132/33kV GSP Substation
SSEN Transmission (north Scotland)
Jun 2030
Arbroath Battery Substation
Battery storage · Arbroath Limited
35 MWConsents Approved Arbroath GSP
SSEN Transmission (north Scotland)
Feb 2022
Montreathmont Moor Forest
Solar + storage · Montreathmont Energy Centre Limited
34 MWConsents Approved Lunanhead GSP
SSEN Transmission (north Scotland)
Oct 2026
MeyGen Tidal
Battery storage · Meygrid Limited
28 MWConsents Approved Gills Bay GSP
SSEN Transmission (north Scotland)
Apr 2027
Tarland Battery Storage System
Battery storage · Tarland Limited
20 MWConsents Approved Tarland 132/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2026
Keithick 16 Solar & BESS
Solar + storage · Sirius Ecodev (Keithick) Ltd
16 MWConsents Approved Coupar Angus 132/33kV GSP
SSEN Transmission (north Scotland)
Dec 2026

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.