Grid infrastructure › Connection queue › Battery storage
BATTERY STORAGE · SHETKeith Battery Storage
Keith Battery Storage is a 39 MW battery storage project consented, connecting to the SSEN Transmission (north Scotland) network at Keith 1 132/33kV GSP Substation, with capacity due from October 2026. The connection agreement is held by Field Keith Ltd.
Project stageConsented
- Planning (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingFrom Oct 2026 (not yet reached)
- Closed (not yet reached)
Connection details
- NESO project number
- PRO-001742
- Customer
- Field Keith Ltd
- Technology
- Energy Storage System
- Total capacity
- 39 MW
- Change in this agreement
- +39 MW
- Capacity effective from
- 31 October 2026
- Connection site
- Keith 1 132/33kV GSP Substation
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Consents Approved
- Connections reform gate
- Gate 2
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem