BATTERY STORAGE Β· SHET

Overhill BESS

Overhill BESS is a 50 MW battery storage project consented, connecting to the SSEN Transmission (north Scotland) network at Rothienorman 2 400/33kV GSP, with capacity due from October 2024. The connection agreement is held by Pulse Clean Energy Spv Watt Limited.

Project stageConsented
  1. Planning (completed)
  2. Consented (current stage)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2024 (not yet reached)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-001974
Customer
Pulse Clean Energy Spv Watt Limited
Technology
Energy Storage System
Total capacity
50 MW
Change in this agreement
+50 MW
Capacity effective from
31 October 2024
Connection site
Rothienorman 2 400/33kV GSP
Transmission owner
SSEN Transmission (north Scotland)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Consents Approved

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Rothienorman Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem