Grid infrastructure βΊ Connection queue βΊ Solar + storage
SOLAR + STORAGE Β· SHETMontreathmont Moor Forest
Montreathmont Moor Forest is a 34 MW solar + storage project consented, connecting to the SSEN Transmission (north Scotland) network at Lunanhead GSP, with capacity due from October 2026. The connection agreement is held by Montreathmont Energy Centre Limited.
Project stageConsented
- Planning (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingFrom Oct 2026 (not yet reached)
- Closed (not yet reached)
Connection details
- NESO project number
- PRO-001849
- Customer
- Montreathmont Energy Centre Limited
- Technology
- Energy Storage System, PV Array (Photo Voltaic/solar)
- Total capacity
- 34 MW
- Change in this agreement
- +34 MW
- Capacity effective from
- 31 October 2026
- Connection site
- Lunanhead GSP
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Consents Approved
- Connections reform gate
- Gate 2
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem