Grid infrastructure › Connection queue › Onshore wind
ONSHORE WIND · SHETChleansaid Wind Farm
Chleansaid Wind Farm is a 96 MW onshore wind project consented, connecting to the SSEN Transmission (north Scotland) network at Chleansaid Wind Farm 132kV Substation, with capacity due from September 2028. The connection agreement is held by Esb Asset Development UK Limited.
Project stageConsented
- Planning (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingFrom Sep 2028 (not yet reached)
- Closed (not yet reached)
Connection details
- NESO project number
- PRO-001608
- Customer
- Esb Asset Development UK Limited
- Technology
- Wind Onshore
- Total capacity
- 96 MW
- Change in this agreement
- +96 MW
- Capacity effective from
- 10 September 2028
- Connection site
- Chleansaid Wind Farm 132kV Substation
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Consents Approved
- Connections reform gate
- Gate 2
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem