Grid infrastructure β€Ί Connection queue β€Ί Battery storage

BATTERY STORAGE Β· SHET

Lovat Estate BESS

Lovat Estate BESS is a 50 MW battery storage project consented, connecting to the SSEN Transmission (north Scotland) network at Beauly 132/33 kV GSP Substation, with capacity due from May 2026. The connection agreement is held by LG-B-50a Limited.

Project stageConsented
  1. Planning (completed)
  2. Consented (current stage)
  3. Construction (not yet reached)
  4. OperatingFrom May 2026 (not yet reached)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-003062
Customer
LG-B-50a Limited
Technology
Energy Storage System
Total capacity
50 MW
Change in this agreement
+50 MW
Capacity effective from
31 May 2026
Connection site
Beauly 132/33 kV GSP Substation
Transmission owner
SSEN Transmission (north Scotland)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Consents Approved
Connections reform gate
Gate 2

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Beauly Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem