Grid infrastructure βΊ Connection queue βΊ Battery storage
BATTERY STORAGE Β· SHETMeetlaw BESS
Meetlaw BESS is a 50 MW battery storage project consented, connecting to the SSEN Transmission (north Scotland) network at Fiddes GSP, with capacity due from October 2031. The connection agreement is held by Carravindoon Limited.
Project stageConsented
- Planning (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingFrom Oct 2031 (not yet reached)
- Closed (not yet reached)
Connection details
- NESO project number
- PRO-001966
- Customer
- Carravindoon Limited
- Technology
- Energy Storage System
- Total capacity
- 50 MW
- Change in this agreement
- +50 MW
- Capacity effective from
- 31 October 2031
- Connection site
- Fiddes GSP
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Consents Approved
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Fiddes GSP
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem