Grid infrastructure βΊ Connection queue βΊ Onshore wind
ONSHORE WIND Β· SHETBlarghour Wind
Blarghour Wind is a 67 MW onshore wind project consented, connecting to the SSEN Transmission (north Scotland) network at Blarghour Substation, with capacity due from April 2029. The connection agreement is held by Blarghour Wind Farm Limited.
Project stageConsented
- Planning (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingFrom Apr 2029 (not yet reached)
- Closed (not yet reached)
Connection details
- NESO project number
- PRO-000398
- Customer
- Blarghour Wind Farm Limited
- Technology
- Wind Onshore
- Total capacity
- 67 MW
- Change in this agreement
- +67 MW
- Capacity effective from
- 1 April 2029
- Connection site
- Blarghour Substation
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Consents Approved
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem