Grid infrastructure › Connection queue › Onshore wind
ONSHORE WIND · SHETCairn Duhie Wind Farm
Cairn Duhie Wind Farm is a 67 MW onshore wind project consented, connecting to the SSEN Transmission (north Scotland) network at Berryburn 275/33kV GSP Substation, with capacity due from October 2028. The connection agreement is held by Cairn Duhie Energy Limited.
Project stageConsented
- Planning (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingFrom Oct 2028 (not yet reached)
- Closed (not yet reached)
Connection details
- NESO project number
- PRO-001743
- Customer
- Cairn Duhie Energy Limited
- Technology
- Wind Onshore
- Total capacity
- 67 MW
- Change in this agreement
- +67 MW
- Capacity effective from
- 31 October 2028
- Connection site
- Berryburn 275/33kV GSP Substation
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Consents Approved
- Connections reform gate
- Gate 2
Connection site
The connection site could not be placed on the map.
Other projects at Berryburn 275/33kV GSP Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem