BATTERY STORAGE · SHET

Corshellach Battery Energy Storage System

Corshellach Battery Energy Storage System is a 50 MW battery storage project consented, connecting to the SSEN Transmission (north Scotland) network at Berryburn 275/33kV GSP Substation, with capacity due from October 2028. The connection agreement is held by Corshellach Energy Storage Limited.

Project stageConsented
  1. Planning (completed)
  2. Consented (current stage)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2028 (not yet reached)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-002328
Customer
Corshellach Energy Storage Limited
Technology
Energy Storage System
Total capacity
50 MW
Change in this agreement
+50 MW
Capacity effective from
31 October 2028
Connection site
Berryburn 275/33kV GSP Substation
Transmission owner
SSEN Transmission (north Scotland)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Consents Approved
Connections reform gate
Gate 2

Connection site

The connection site could not be placed on the map.

Projects connecting near Berryburn · Grid map

Other projects at Berryburn 275/33kV GSP Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem