BATTERY STORAGE Β· SHETArbroath Battery Substation
Arbroath Battery Substation is a 35 MW battery storage project consented, connecting to the SSEN Transmission (north Scotland) network at Arbroath GSP, with capacity due from February 2022. The connection agreement is held by Arbroath Limited.
Project stageConsented
- Planning (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingFrom Feb 2022 (not yet reached)
- Closed (not yet reached)
Connection details
- NESO project number
- PRO-000950
- Customer
- Arbroath Limited
- Technology
- Energy Storage System
- Total capacity
- 35 MW
- Change in this agreement
- +35 MW
- Capacity effective from
- 21 February 2022
- Connection site
- Arbroath GSP
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Consents Approved
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Arbroath GSP
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem