SOLAR Β· SHETCraigend
Craigend is a 50 MW solar project in planning, connecting to the SSEN Transmission (north Scotland) network at Arbroath GSP, with capacity due from June 2032. The connection agreement is held by Renewable Energy Systems Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Jun 2032 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-002567
- Customer
- Renewable Energy Systems Limited
- Technology
- PV Array (Photo Voltaic/solar)
- Total capacity
- 50 MW
- Change in this agreement
- +50 MW
- Capacity effective from
- 30 June 2032
- Connection site
- Arbroath GSP
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Scoping
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Arbroath GSP
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem