Stornoway Wind Farm is a 180 MW onshore wind project consented, connecting to the SSEN Transmission (north Scotland) network at Arnish 275kV Substation, with capacity due from October 2030. The connection agreement is held by Stornoway Wind Farm Limited.
Project stageConsented
- Planning (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingFrom Oct 2030 (not yet reached)
- Closed (not yet reached)
Connection details
- NESO project number
- PRO-000346
- Customer
- Stornoway Wind Farm Limited
- Technology
- Wind Onshore
- Total capacity
- 180 MW
- Change in this agreement
- +180 MW
- Capacity effective from
- 31 October 2030
- Connection site
- Arnish 275kV Substation
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Consents Approved
Connection site
The marker shows the place the connection site is named after, not the project itself, with the transmission network around it.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem