OTHER Β· SHETThainstone Energy Park
Thainstone Energy Park is a 40 MW other project consented, connecting to the SSEN Transmission (north Scotland) network at Kintore GSP, with capacity due from October 2029. The connection agreement is held by Agile Energy Recovery (Inverurie) Limited.
Project stageConsented
- Planning (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingFrom Oct 2029 (not yet reached)
- Closed (not yet reached)
Connection details
- NESO project number
- PRO-001493
- Customer
- Agile Energy Recovery (Inverurie) Limited
- Technology
- Waste
- Total capacity
- 40 MW
- Change in this agreement
- +40 MW
- Capacity effective from
- 31 October 2029
- Connection site
- Kintore GSP
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Consents Approved
- Connections reform gate
- Gate 2
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Kintore GSP
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem