Grid infrastructure › Connection queue › Battery storage
BATTERY STORAGE · SHETCoupar Angus Battery
Coupar Angus Battery is a 40 MW battery storage project consented, connecting to the SSEN Transmission (north Scotland) network at Coupar Angus 132/33kV GSP, with capacity due from February 2022. The connection agreement is held by Coupar Limited.
Project stageConsented
- Planning (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingFrom Feb 2022 (not yet reached)
- Closed (not yet reached)
Connection details
- NESO project number
- PRO-000905
- Customer
- Coupar Limited
- Technology
- Energy Storage System
- Total capacity
- 40 MW
- Change in this agreement
- +40 MW
- Capacity effective from
- 21 February 2022
- Connection site
- Coupar Angus 132/33kV GSP
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Consents Approved
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Coupar Angus 132/33kV GSP
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem