Grid infrastructure › Connection queue › Solar + storage

SOLAR + STORAGE · SHET

Keithick Estate

Keithick Estate is a 50 MW solar + storage project under construction or commissioning, connecting to the SSEN Transmission (north Scotland) network at Coupar Angus 132/33kV GSP, with capacity due from December 2026. The connection agreement is held by Sirius Ecodev (Stirling) Ltd.

Project stageUnder construction
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (current stage)
  4. OperatingFrom Dec 2026 (not yet reached)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-001732
Customer
Sirius Ecodev (Stirling) Ltd
Technology
Energy Storage System, PV Array (Photo Voltaic/solar)
Total capacity
50 MW
Change in this agreement
+50 MW
Capacity effective from
31 December 2026
Connection site
Coupar Angus 132/33kV GSP
Transmission owner
SSEN Transmission (north Scotland)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Under Construction/Commissioning
Connections reform gate
Gate 2

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Coupar Angus · Grid map

Other projects at Coupar Angus 132/33kV GSP

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem