Perwinnes

Perwinnes is a 45 MW solar + storage project consented, connecting to the SSEN Transmission (north Scotland) network at Dyce 132/33kV GSP, with capacity due from October 2028. The connection agreement is held by Perwinnes Solar And Battery Storage Limited.

Project stageConsented
  1. Planning (completed)
  2. Consented (current stage)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2028 (not yet reached)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-001934
Customer
Perwinnes Solar And Battery Storage Limited
Technology
Energy Storage System, PV Array (Photo Voltaic/solar)
Total capacity
45 MW
Change in this agreement
+45 MW
Capacity effective from
31 October 2028
Connection site
Dyce 132/33kV GSP
Transmission owner
SSEN Transmission (north Scotland)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Consents Approved
Connections reform gate
Gate 2

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Dyce Β· Grid map

Other projects at Dyce 132/33kV GSP

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem