Grid infrastructure › Connection queue › Onshore wind
ONSHORE WIND · SHETBeaw Field Wind Farm
Beaw Field Wind Farm is a 102 MW onshore wind project consented, connecting to the SSEN Transmission (north Scotland) network at Beaw Field 132/33kV Substation, with capacity due from October 2032. The connection agreement is held by Beaw Field Shetland Limited.
Project stageConsented
- Planning (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingFrom Oct 2032 (not yet reached)
- Closed (not yet reached)
Connection details
- NESO project number
- PRO-000026
- Customer
- Beaw Field Shetland Limited
- Technology
- Wind Onshore
- Total capacity
- 102 MW
- Change in this agreement
- +102 MW
- Capacity effective from
- 29 October 2032
- Connection site
- Beaw Field 132/33kV Substation
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Consents Approved
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem