Grid infrastructure › Connection queue › Battery storage
BATTERY STORAGE · SHETZenobe Blackhillock 300 MW
Zenobe Blackhillock 300 MW is a 300 MW battery storage project consented, connecting to the SSEN Transmission (north Scotland) network at Blackhillock 275kV Substation, with capacity due from April 2026. The connection agreement is held by Zenobe Blackhillock Limited.
Project stageConsented
- Planning (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingFrom Apr 2026 (not yet reached)
- Closed (not yet reached)
Connection details
- NESO project number
- PRO-001624-2
- Customer
- Zenobe Blackhillock Limited
- Technology
- Energy Storage System
- Total capacity
- 300 MW
- Change in this agreement
- +100 MW
- Capacity effective from
- 1 April 2026
- Connection site
- Blackhillock 275kV Substation
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Consents Approved
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Blackhillock 275kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem