Grid infrastructure › Connection queue › Battery storage
BATTERY STORAGE · SHETZenobe Blackhillock 300 MW
Zenobe Blackhillock 300 MW is a 200 MW battery storage project built and connected, connecting to the SSEN Transmission (north Scotland) network at Blackhillock 275kV Substation. The connection agreement is held by Zenobe Blackhillock Limited.
Connection details
- NESO project number
- PRO-001624-1
- Customer
- Zenobe Blackhillock Limited
- Technology
- Energy Storage System
- Total capacity
- 200 MW
- Already connected
- 200 MW
- Connection site
- Blackhillock 275kV Substation
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Built
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Blackhillock 275kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem