Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · SHET

Blackhillock Battery

Blackhillock Battery is a 349 MW battery storage project consented, connecting to the SSEN Transmission (north Scotland) network at Blackhillock 400kV Substation, with capacity due from October 2028. The connection agreement is held by Blackhillock Flexpower Ltd.

Project stageConsented
  1. Planning (completed)
  2. Consented (current stage)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2028 (not yet reached)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-001970
Customer
Blackhillock Flexpower Ltd
Technology
Energy Storage System
Total capacity
349 MW
Change in this agreement
+349 MW
Capacity effective from
31 October 2028
Connection site
Blackhillock 400kV Substation
Transmission owner
SSEN Transmission (north Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Consents Approved
Connections reform gate
Gate 2

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Blackhillock · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem