Grid connection projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown2,255782.1 GW in total
In planning1,590scoping or awaiting consent
Consented or building265closest to connecting
Built400connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

2,255 projects · page 45 of 46
ProjectCapacityStageConnection siteFrom
Gordonstown Hill Wind Farm
Onshore wind · Gordonstown Hill Wind Farm Limited
13 MWBuilt Rothienorman GSP
SSEN Transmission (north Scotland)
Dealanach WLC WF
Onshore wind · Dealanach Limited
12 MWScoping Hopsrig Collector 132/33kV Substation
SP Transmission (south Scotland)
Dec 2026
Feckenham Greener Grid Park
Battery storage · Statkraft UK Ltd
12 MWScoping Feckenham 400kV Substation
National Grid (England & Wales)
Oct 2028
Green Frog at Lester Way
Gas · Viridis 178 Limited
12 MWBuilt Cowley GSP
National Grid (England & Wales)
Swansea Greener Grid Park - Connection 1
Battery storage · Swansea Grid Solutions Limited
12 MWUnder Construction/Commissioning Swansea North 400kV Substation
National Grid (England & Wales)
Aug 2024
Broadditch BESS
Battery storage · Harmony BD Ltd
12 MWBuilt Northfleet East 132kV
National Grid (England & Wales)
Cashlie (Part of Killin Cascade Hydro Scheme)
Hydro and pumped storage · Sse Generation Limited
11 MWBuilt Cashlie GSP
SSEN Transmission (north Scotland)
Dersalloch Wind Farm Extension
Battery storage · Scottish Power Renewables (UK) Limited
11 MWScoping Dersalloch 132/33kV
SP Transmission (south Scotland)
Oct 2027
Abedare
Gas · UK Power Reserve Limited
10 MWBuilt Upperboat 132kV Substation
National Grid (England & Wales)
Cwm Dyli
Hydro and pumped storage · RWE Generation UK Plc
10 MWBuilt Trawsfynydd 275kV Substation
National Grid (England & Wales)
Enoch Hill 2 Wind Farm
Wind + storage · RWE Renewables UK Onshore Wind Limited
10 MWAwaiting Consents Enoch Hill 2 Wind Farm 33kV Substation
SP Transmission (south Scotland)
Apr 2027
Huntworth
Gas · UK Power Reserve Limited
10 MWBuilt Taunton GSP
National Grid (England & Wales)
Hutton Battery Storage
Battery storage · Osspv001 Limited
10 MWBuilt Hutton 400kV Substation
National Grid (England & Wales)
Sevington
Gas · UK Power Reserve Limited
10 MWBuilt Sellindge 132kV Substation
National Grid (England & Wales)
Solutia
Gas · UK Power Reserve Limited
10 MWBuilt Uskmouth 132kV Substation
National Grid (England & Wales)
Elvanfoot (9.8 MW) Energy Storage
Battery storage · Elvanfoot Energy Storage Limited
9.8 MWConsents Approved Elvanfoot 400/275/33kV
SP Transmission (south Scotland)
Apr 2027
Pogbie Wind Farm
Onshore wind · Pogbie Wind Farm (Grid) Limited
9.6 MWBuilt Pogbie 33kV
SP Transmission (south Scotland)
Brownieleys
Onshore wind · Brownieleys Renewables LLP
7.5 MWBuilt Fiddes GSP
SSEN Transmission (north Scotland)
Holes Bay
Battery storage · Harmony Hb Limited
7.5 MWBuilt Holes Bay Battery Storage
National Grid (England & Wales)
Green frog @ The Drove
Gas · Viridis 178 Limited
6 MWBuilt Bridgwater 400/132kV Substation
National Grid (England & Wales)
PeakGen BEGA - Coventry
Gas · Peak Gen Top Co Limited
6 MWBuilt Coventry GSP
National Grid (England & Wales)
PeakGen BEGA - Hatfield
Gas · Peak Gen Top Co Limited
6 MWBuilt Hatfield GSP
National Grid (England & Wales)
PeakGen BEGA - Haydock
Gas · Peak Gen Power Limited
6 MWBuilt Haydock GSP
National Grid (England & Wales)
Hunterston Hydrogen
Hydro and pumped storage · Statkraft Hydrogen UK Holding Limited
5 MWScoping Hunterston 400/132kV
SP Transmission (south Scotland)
Oct 2033
Scatsta1 Greener Grid Park
Battery storage · Statkraft Hydrogen UK Holding Limited
5 MWScoping Scatsta 132kV Substation
SSEN Transmission (north Scotland)
Oct 2028
Craig II Wind Farm
Onshore wind · Craig Wind Farm Limited
4.7 MWBuilt Chapelcross 132/33kV
SP Transmission (south Scotland)
Keith Hill Wind Farm
Onshore wind · Diamond Wind Limited
4.5 MWBuilt Keith Hill 33kV
SP Transmission (south Scotland)
Lubreoch Hydro (Part of Killin Cascade Hydro Scheme)
Hydro and pumped storage · Sse Generation Limited
4 MWBuilt Killin GSP
SSEN Transmission (north Scotland)
PeakGen BEGA - Didcot
Gas · Peak Gen Power Limited
4 MWBuilt Didcot GSP
National Grid (England & Wales)
Whitelaw Brae BESS
Battery storage · Buk23 Limited
1 MWUnder Construction/Commissioning Whitelaw Brae BESS 33kV substation
SP Transmission (south Scotland)
Jul 2026
Ayrshire Grid Services Facility
Other · Hunterston Grid 3 Ltd
0 MWConsents Approved Ayrshire Grid 400kV Collector Substation
SP Transmission (south Scotland)
Mar 2028
Beatrice Sync Comp
Other · Tinz Programme 1 Projectco 3 Limited
0 MWBuilt Beatrice 400kV Substation
SSEN Transmission (north Scotland)
Bolney Grid Stability Services
Other · Wp Grid Services 13 Limited
0 MWScoping Bolney 400kV Substation
National Grid (England & Wales)
Oct 2031
Hunterston
Nuclear · Nuclear Restoration Services Limited
0 MWBuilt Hunterston 400/132kV
SP Transmission (south Scotland)
Cilfynydd Grid Stability Services
Other · Cilfynydd Grid Services Limited
0 MWConsents Approved Cilfynydd 400kV Substation
National Grid (England & Wales)
Mar 2027
Cryogenic Battery System (Synchronous)
Battery storage · Cryobattery One Limited
0 MWUnder Construction/Commissioning Carrington 400KV Substation
National Grid (England & Wales)
May 2026
Dungeness B
Nuclear · EDF Energy Nuclear Generation Limited
0 MWBuilt Dungeness 275kV Substation
National Grid (England & Wales)
Eye Grid Services Facility
Other · Conrad (Eye) Limited
0 MWConsents Approved Yaxley 400kV Substation
National Grid (England & Wales)
Dec 2025
Fife Grid Services
Other · Kincardine Grid 3 Ltd
0 MWScoping Fife Grid Services Facility 275kV Substation
SP Transmission (south Scotland)
Jul 2027
GF Upper Boat
Battery storage · Pulse Clean Energy Spv Franklin Limited
0 MWScoping Upper Boat 275kV Substation
National Grid (England & Wales)
May 2025
GF Upper Boat
Battery storage · Pulse Clean Energy Spv Franklin Limited
0 MWScoping Upper Boat 275kV Substation
National Grid (England & Wales)
Oct 2025
Gretna Synchronous Compensation
Other · Gretna Grid Services Limited
0 MWBuilt Gretna 400/132kV
SP Transmission (south Scotland)
Keith 132 Greener Grid Park
Battery storage · Keith Storage Solutions Limited
0 MWBuilt Keith 132kV Substation
SSEN Transmission (north Scotland)
Lister Drive 275kV
Other · Lister Drive Solutions Limited
0 MWBuilt Lister Drive 275kV Substation
National Grid (England & Wales)
Mersey Reactive 1
Other · Mersey Reactive Power Limited
0 MWBuilt Frodsham (Network Rail) GSP
National Grid (England & Wales)
Necton Greener Grid Park
Battery storage · Necton Grid Solutions Limited
0 MWConsents Approved Necton 400kV Substation
National Grid (England & Wales)
Oct 2026
Neilston Synchronous Compensation
Other · Neilston Grid Services Limited
0 MWConsents Approved Neilston 400kV Substation
SP Transmission (south Scotland)
Jun 2025
Ninfield Greener Grid Park
Battery storage · Ninfield Grid Solutions Limited
0 MWAwaiting Consents Ninfield 400kV Substation
National Grid (England & Wales)
Apr 2027
Rassau Stability Services Limited
Other · WP Grid Services 16 Limited
0 MWScoping Rassau 400kV Substation
National Grid (England & Wales)
Oct 2037
Rothienorman Sync Comp
Other · Rothienorman Grid Services Limited
0 MWBuilt Rothienorman 400kV Substation
SSEN Transmission (north Scotland)
Page 45 of 46

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.