Lubreoch Hydro (Part of Killin Cascade Hydro Scheme)

Lubreoch Hydro (Part of Killin Cascade Hydro Scheme) is a 4 MW hydro and pumped storage project built and connected, connecting to the SSEN Transmission (north Scotland) network at Killin GSP. The connection agreement is held by Sse Generation Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-000893
Customer
Sse Generation Limited
Technology
Hydro
Total capacity
4 MW
Already connected
4 MW
Connection site
Killin GSP
Transmission owner
SSEN Transmission (north Scotland)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Killin GSP · Grid map

Other projects at Killin GSP

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem