Grid infrastructure βΊ Connection queue βΊ Gas
GAS Β· NGETGreen frog @ The Drove
Green frog @ The Drove is a 6 MW gas project built and connected, connecting to the National Grid (England & Wales) network at Bridgwater 400/132kV Substation. The connection agreement is held by Viridis 178 Limited.
Connection details
- NESO project number
- PRO-000245
- Customer
- Viridis 178 Limited
- Technology
- OCGT (Open Cycle Gas Turbine)
- Total capacity
- 6 MW
- Already connected
- 6 MW
- Connection site
- Bridgwater 400/132kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Built
Connection site
The marker shows the place the connection site is named after, not the project itself, with the transmission network around it.
Other projects at Bridgwater 400/132kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem