Green frog @ The Drove

Green frog @ The Drove is a 6 MW gas project built and connected, connecting to the National Grid (England & Wales) network at Bridgwater 400/132kV Substation. The connection agreement is held by Viridis 178 Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-000245
Customer
Viridis 178 Limited
Technology
OCGT (Open Cycle Gas Turbine)
Total capacity
6 MW
Already connected
6 MW
Connection site
Bridgwater 400/132kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Built

Connection site

The marker shows the place the connection site is named after, not the project itself, with the transmission network around it.

Projects connecting near Bridgwater Β· Grid map

Other projects at Bridgwater 400/132kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem